Guanmenyan Hydropower Project
Description: The project is a new hydropower plant with a reservoir; the total installed capacity is 33 MW with 3,033 utilization hours for electricity generation annually. The surface area at the full reservoir level is 2.5km2, thus the power density of the project is 13.2W/m2. The electricity is delivered to the Central China Power
Grid (CCPG). When the project is completed, it can produce electricity of 100,080 MWh with net
electricity of 93,170 MWh supplied to the grid annually1.
| Project Type: |
Hydroelectric Power |
| Location: |
China |
| Quantity: |
97,000 tonnes CO2e per year |
| Accounting period: |
- |
| Operator: |
Xiangshi Town,
Cili County,
Hunan Province |
| Standard: |
- |
| Supported by: |
Tricorona (Sweden)
|
| Entry created: |
21st January 2010 |
| Last updated: |
19th May 2010 |
| |
|
|
|
|