Godawari 7MW WHR

Description: Of the 18 MW installed capacity of the CPP at GPIL, about 7MW power is generated by utilizing heat content of the waste gases released from Direct Reduction Iron (DRI) kilns of the sponge iron process. The heat from the gases is transferred to a Waste Heat Recovery Boiler (WHRB) to produce steam. The steam produced is fed to a common steam header, from where it is finally fed to turbo-generator sets to generate power.


Project Type: Fuel Substitution
Location: Siltara, Raipur District, Chattisgarh, India
Quantity: 17,829 tonnes CO2e per year
Accounting period: -
Operator: -
Standard: -
Supported by: Tricorona (Sweden)
Entry created: 21st January 2010
Last updated: 26th July 2010
   